Projects
-
New construction of A4 Magdala - Jena/Göschwitz
Six-lane new construction over 12 km • One of the biggest traffic way projects in Germany • Calculation of control data • Administration of as-built data with MicroStation -
Fraport
Surveying task for new constructions and re-construction measures during airport operation • Administration of the digital airport as-built plan • Total construction value until now approx. 500.000 m² concrete area and approx. 70.000 m² asphalt area -
Main levelling Elbe
Double levelling over 320 km • Measuring of about 400 level control points • 2 stream crossing measurements
BKR – Surveying of Infrastructure
In such a densely populated region like Central Europe and especially Germany an efficient infrastructure is essential. Extensive road networks with high quality, like highways, state roads and regional roads are belonging to this infrastructure. Apart from that the railway network, which transports people as well as goods everywhere in the country and thus disburdens the roads, is very important. Well designed international and also regional airports are part of an industrial nation and because of their complexity they need a particular good planning.
For the transport sector our waterways are not that fundamental anymore like in the past, however they are still important. The countries thus have to make sure that these waterways continue to be navigable.
For all these tasks high-quality materials and precise execution of construction activities are necessary amongst others. Accurate surveying data, which is processed and displayed in CAD systems, is taken as basis.
For all these tasks high-quality materials and precise execution of construction activities are necessary amongst others. Accurate surveying data, which is processed and displayed in CAD systems, is taken as basis.